L-3 Link Simulation & Training (L-3 Link) announced that it has installed a Predator Mission Aircrew Training System (PMATS) at Tucson Air National Guard (ANG) Base and completed upgrades on fielded systems at Holloman Air Force Base (AFB).
Author Archives: The Editor
Lockheed Martin Introduces Ruggedized Stalker Extreme Endurance
Lockheed Martin has developed a ruggedized version of its Stalker Unmanned Air System (UAS), called the Stalker eXtreme Endurance (XE) UAS.
Griffon Aerospace Introduces the Extended Range Outlaw
Griffon Aerospace unveils a new version of the Outlaw – the Extended Range (ER) incorporates a new fuselage providing addition payload and fuel volume.
Boeing Demonstrates ‘Swarm’ Reconnaissance with Unmanned Aircraft
Boeing has announced the successful autonomous communications and operation of dissimilar unmanned aircraft in flight tests over the rugged terrain of eastern Oregon.
NAVAIR to Host Industry Day for Medium Range Maritime UAS Research Support Effort
NAVAIR will host an Industry Day for the MRMUAS Research Support Effort on 07 September 2011. The Industry Day will take place at the Southern Maryland Higher Education Center, 44219 Airport Road, California, Maryland, MD 20619.
ITT and Mercury Launch Embedded ISR Processing System
ITT Corporation and Mercury Computer Systems, Inc. have jointly developed a processing solution known as FELCO (Federated Embedded inteL-server for Collaborative Operations) that meets the ISR interoperability needs of the warfighter. Continue reading
DRS Defense Solutions to Provide UAS Simulation Services for Joint UAS Center of Excellence
DRS Defense Solutions announced that it has been awarded a contract by Fleet & Industrial Supply (FISC) in Norfolk, Va., in support of the Joint Unmanned Aircraft System Center of Excellence (JUAS COE) at Creech Air Force Base, Nevada.
Raytheon Completes Lab Testing Gravity-Dropped Bomb Specifically Designed for Employment from UAS
Raytheon Company completed laboratory integration and testing of its Small Tactical Munition Phase II configuration, setting the stage for flight tests later this year. The new configuration is smaller, more affordable and fits in common launch tube.
